buffers are added to the network where noncritical paths merge with the critical chain. these buffers protect the critical chain from being delayed. multiple choice question.

Answers

Answer 1

Buffers are time reserves added to each stage of the critical chain, and they ensure that the project remains on schedule. Buffers are incorporated into a project schedule to secure the timely delivery of project stages.

The buffers are added to the network where non-critical paths merge with the critical chain to protect the critical chain from being delayed. This is a true statement. The critical chain is the longest path of the project network, and it determines the completion date of the project. In contrast, non-critical paths are those that are not vital for the project completion. It gives additional time to complete the critical chain by using time reserved on other chains. Buffers safeguard against inevitable issues such as workmanship and supply chain. Buffers are found in two places, feeding and project completion buffers. Feeding buffers are employed to protect critical chain stages from disruptions that are likely to occur as a result of variation in previous tasks. Feed buffers are used in tasks that are fed by a single task. Project completion buffers, on the other hand, are used to protect the whole critical chain from unforeseen delays in any of its stages.  The answer is, "true".

Learn more about critical chain here:

https://brainly.com/question/31218520

#SPJ11


Related Questions

public class ChangeCase {public static void main(String args[]) {Scanner s = new Scanner(System.in); String sample; String result; System.out.println("Enter a string or done when you want to quit."); sample = s.nextLine(); while(sample.compareTo("done") != 0) { // Call () method here and print the result. System.out.println("Lowercase: " + result); // Call () method here and print the result. System.out.println("Uppercase: " + result); System.out.println("Enter a string or done when you want to quit."); sample = s.nextLine(); } System.exit(0); } // End of main() method. } // End of ChangeCase class.

Answers

Answer:

The code you provided is the beginning of a Java program that prompts the user to enter a string and then converts that string to both lowercase and uppercase using methods that are not yet defined. Here is the modified code with the missing methods implemented:

Explanation:

import java.util.Scanner;

public class ChangeCase {

   public static void main(String args[]) {

       Scanner s = new Scanner(System.in);

       String sample;

       String result;

       System.out.println("Enter a string or 'done' when you want to quit.");

       sample = s.nextLine();

       while(sample.compareTo("done") != 0) {

           // Call toLowerCase() method here and print the result.

           result = sample.toLowerCase();

           System.out.println("Lowercase: " + result);

           // Call toUpperCase() method here and print the result.

           result = sample.toUpperCase();

           System.out.println("Uppercase: " + result);

           System.out.println("Enter a string or 'done' when you want to quit.");

           sample = s.nextLine();

       }

       System.exit(0);

   }

}

which commands would you use to save and undo table changes? a. save and undo b. save and rollback c. commit and rollback d. commit and undo

Answers

The commands that can be used to save and undo table changes are "commit and rollback".Answer: c. commit and rollback

To perform transactions in the database, the SQL provides the following four important commands:commit: If a transaction is successful, the commit command is used to save the changes. rollback: In the case of an error or as per the user’s need, the rollback command is used to undo the changes made in the table. The entire transaction is rolled back when the rollback command is executed. save: It stores the data or transaction from the session in the database memory temporarily. The save command does not store it permanently. The save command saves the specified data points at the moment, but not in the memory. commit and rollback are the two primary commands that are used to save and undo table changes. In addition, the save command is used to store data in memory temporarily, and the undo command is not a SQL command.

learn more about commit and rollback here:

https://brainly.com/question/29853510

#SPJ11

I need help with this thing called Switch Conditional Statements on OnlineGDB (Using just plain Java) I need code for the file Main.java and phonecalls.txt is the file that's supposed to give the data depending on what you put in it. (also, the code needs to be added from the base code, since the base code is required along with additional code to make it work, except for the questions marks, those are just markers for some of the code that needs to be there)

Answers

This programme reads the data from the phonecalls.txt file and divides it into two lines, each with a comma in between (assuming the duration of the call is the second part).

What Java software can read a.txt file?

You can read files line by line by using FileReader to obtain the BufferedReader. Because FileReader only supports the system default encoding and doesn't support encoding, it is not a particularly effective method for reading text files in Java.

java.io.File, java.io.FileNotFoundException, and java.util.Scanner are imported.

a common class The main function is public static void (String[] args) Scanner scanner = new Scanner("phonecalls.txt"); try Scanner = new Scanner("phonecalls.txt"); while (scanner.hasNextLine()) The following formulas are used: String line = scanner.nextLine(); String[] parts = line.split(","); and int duration = Integer. parseInt(parts[1]);

callType in a string; switch (duration) Case 0: callType = "Missed call"; break; Cases 1–4: callType = "Short call"; break; Cases 5–10: missed call;

To know more about programme visit:-

https://brainly.com/question/30307771?

#SPJ1

write a query to determine supplier number, part number, project number and weight shipped of the maximum weight shipped. be sure to consider the quantity ordered when calculating weight shipped.

Answers

The HAVING clause is used to select only the rows that have the maximum weight_shipped. The subquery in the HAVING clause is used to calculate the maximum weight_shipped.

The SQL query to determine supplier number, part number, project number, and weight shipped of the maximum weight shipped is shown below:SELECT supplier_number, part_number, project_number, SUM(quantity_ordered) * weight_per_unit AS weight_shippedFROM ordersGROUP BY supplier_number, part_number, project_numberHAVING SUM(quantity_ordered) * weight_per_unit = (SELECT MAX(SUM(quantity_ordered) * weight_per_unit)FROM ordersGROUP BY supplier_number, part_number, project_number)Explanation:In the SQL query, the SELECT statement is used to select supplier_number, part_number, project_number, and weight_shipped columns from the orders table. The weight_shipped column is calculated using the formula SUM(quantity_ordered) * weight_per_unit, where quantity_ordered is the number of parts ordered and weight_per_unit is the weight of each part. The FROM clause is used to specify the orders table.The GROUP BY clause is used to group the results by supplier_number, part_number, and project_number columns.

Learn more about query here:

https://brainly.com/question/30881914

#SPJ11

attackers have used a brute force attack to crack chf hashes in your network. what could you do to better protect the original strings?

Answers

In order to better protect the original strings, one should increase the complexity of the passwords and implement additional security measures to prevent brute force attacks.

This may include the following steps:1. Implement strong security measurespolicies that require users to create long and complex passwords that include a combination of uppercase and lowercase letters, numbers, and symbols.2. Use a password manager to generate and store passwords securely.3. Implement multi-factor authentication to add an additional layer of security to user accounts.4. Monitor network traffic for signs of malicious activity and respond to incidents promptly.5. Conduct regular security assessments to identify vulnerabilities and implement appropriate remediation measures.6. Train employees on proper password management and security measures best practices.7. Implement network segmentation to limit the impact of a breach.8. Consider using more advanced encryption techniques to protect sensitive data.

Learn more about security measures here:

https://brainly.com/question/14499436

#SPJ4

a data analyst reviews a database of wisconsin car sales to find the last five car models sold in milwaukee in 2019. how can they sort and filter the data to return the last five cars sold at the top of their list? select all that apply.

Answers

A data analyst can sort and filter the data to return the last five cars at the top by taking Filter out sales outside of Milwaukee, Filter out sales not in 2019 and Sort by date in descending order. So, options A, B and D are correct.

To return the last five car models sold in Milwaukee in 2019, the data analyst can use the following sorting and filtering techniques:

Filter out sales outside of Milwaukee: This can be done by applying a filter on the location column of the database, selecting only the rows where the location is Milwaukee.Filter out sales not in 2019: This can be done by applying a filter on the date column of the database, selecting only the rows where the year is 2019.Sort by date in descending order: This can be done by sorting the filtered data by date column in descending order, so that the most recent sales are at the top. This can be achieved using the "ORDER BY" clause in SQL or similar sorting functions in other data analysis tools.

Here's a step-by-step approach for achieving this in SQL:

-- Step 1: Filter out sales outside of Milwaukee

SELECT *

FROM car_sales

WHERE location = 'Milwaukee';

-- Step 2: Filter out sales not in 2019

SELECT *

FROM car_sales

WHERE location = 'Milwaukee' AND YEAR(date) = 2019;

-- Step 3: Sort by date in descending order and limit to last five rows

SELECT *

FROM car_sales

WHERE location = 'Milwaukee' AND YEAR(date) = 2019

ORDER BY date DESC

LIMIT 5;

Learn more about data analyst here:

brainly.com/question/30132968

#SPJ11

The actual question is:

A data analyst reviews a database of Wisconsin car sales to find the last five car models sold in Milwaukee in 2019. How can they sort and filter the data to return the last five cars at the top? Select all that apply.

A) Filter out sales outside of Milwaukee

B) Filter out sales not in 2019

C) Sort by date in ascending order

D) Sort by date in descending order

5
Next O Media Literacy: Mastery Test
Select the correct answer.
What is one effect that the Internet has had on media?

Answers

The Internet has profoundly impacted the media industry, disrupting traditional models and creating new opportunities for content creators and consumers.

What is the explanation for the above response?

One major effect of the Internet on media is the democratization of information and news.

With the rise of social media and citizen journalism, anyone with an internet connection can share and consume news and information, without the need for traditional gatekeepers.

This has led to a more diverse range of voices and perspectives being represented in the media landscape. However, it has also led to challenges such as misinformation and the erosion of trust in traditional news sources, as well as questions around censorship and content moderation.

Learn more about Internet  at:

https://brainly.com/question/13308791

#SPJ1

given five memory partitions of 100 kb, 500 kb, 200 kb, 300 kb, and 600 kb (in order), how would the first-fit algorithm place processes of 212 kb, 417 kb, 112 kb and 426 kb (in order)? specifically, 212kb process will be put in .

Answers

The 212 kb process will be placed in the 500 kb partition using the first-fit algorithm, while the 417 kb process will be placed in the 600 kb partition, the 112 kb process in the 200 kb partition, and the 426 kb process in the remaining 300 kb partition.

The first-fit algorithm places processes in the first available partition that is large enough to accommodate the process. Starting with the first partition, the 212 kb process would be placed in the 300 kb partition, leaving 88 kb of unused space. The 417 kb process would be placed in the 600 kb partition, leaving 183 kb of unused space. The 112 kb process would be placed in the 100 kb partition, leaving 12 kb of unused space. Finally, the 426 kb process would be placed in the 500 kb partition, leaving 74 kb of unused space. Therefore, the 212 kb process would be placed in the 300 kb partition using the first-fit algorithm.

learn more about the first-fit algorithm here:

https://brainly.com/question/29850197

#SPJ4

android and ios both offer a quick swipe to get to some basic settings such as those that allow you to turn on bluetooth and adjust brightness. what are these tools called?

Answers

These are referred to as "fast settings." Users may rapidly access commonly used settings like Wi-Fi, Bluetooth, brightness, and other device settings with the help of a set of toggles called fast settings.

They are referred to as "quick settings." With the use of a series of toggles referred to as fast settings, users may quickly access frequently used settings including Wi-Fi, Bluetooth, brightness, and other device settings. On both iOS and Android smartphones, you may access them by swiping downward from the top of the screen. When opposed to scrolling through menus to locate the same options, quick settings give quick access to crucial operations. The fast settings panel may be modified by the user by choosing which toggles to include and in what order they appear. By swiping left or right on the fast settings panel, users of some devices can access additional quick settings choices.

learn more about Bluetooth here:

https://brainly.com/question/13072419

#SPJ4

Java Coding help please this is from a beginner's class(I AM DESPERATE)
The info is added in the picture

Answers

Answer:

import java.io.File;

import java.io.FileNotFoundException;

import java.util.*;

class Main {

 public static void main(String[] args) {

 try {

  Scanner scanner = new Scanner(new File("scores.txt"));

     int nrAthletes = scanner.nextInt();

     ArrayList<String> athletes = new ArrayList<String>();

     int winnerIndex = 0;

     Double highestAverage = 0.0;

     

  for(int i=0; i<nrAthletes; i++) {

       // Get the name of the athlete as the first item

       String athleteName = scanner.next();

       athletes.add(athleteName);

       

       // Start collecting scores

       ArrayList<Double> scores = new ArrayList<Double>();        

       while(scanner.hasNextDouble()) {

         scores.add(scanner.nextDouble());

       }

       

       // Remove lowest and highest

       scores.remove(Collections.min(scores));

       scores.remove(Collections.max(scores));

       

       // Calculate average

       double sum = 0.0;

       for(double score: scores) {

         sum += score;

       }

       Double averageScore = sum / scores.size();

       // Keep track of winner

       if (averageScore >= highestAverage) {

         highestAverage = averageScore;

         winnerIndex = i;

       }

       

       // Output to screen

      System.out.printf("%s %.2f\n", athleteName, averageScore );

  }

     // Output winner

     System.out.printf("Winner: %s\n", athletes.get(winnerIndex) );

  scanner.close();

 } catch (FileNotFoundException e) {

  e.printStackTrace();

 }

 }

}

Explanation:

Of course this code lacks error handling, but it shows an approach using the scanner object and array lists.

your company wants to purchase some network hardware to connect its separate networks together. what kind of network device is appropriate?

Answers

To connect separate networks together in your company, an appropriate network device would be a router. A router is designed to forward data packets between different networks, providing a connection between them.

Step-by-step explanation:
1. Identify the networks you want to connect.
2. Determine the number of ports needed on the router, based on the number of networks you wish to connect.
3. Purchase a suitable router with the required number of ports.
4. Configure the router with the necessary settings, such as IP addresses and routing protocols, to enable communication between the separate networks.
5. Connect the router to the different networks using appropriate cables.
6. Test the connection and make any necessary adjustments to ensure smooth communication between the networks.

You can learn more about routers at: brainly.com/question/29869351

#SPJ11

which of the following is not a function of a dbms? group of answer choices allow the storage, updating and retrieval of data in the database coordinate multiuser database access provide links between different files that are used together

Answers

The function that is not a part of a DBMS (Database Management System) is "provide links between different files that are used together."

A DBMS primarily focuses on allowing the storage, updating, and retrieval of data in the database, as well as coordinating multiuser database access.A DBMS, or database management system, is a software system that is used to allow the storage, updating, and retrieval of data in the database. It is also used to coordinate multi-user database access. However, providing links between different files that are used together is not a function of a DBMS.

Learn more about DBMS: https://brainly.com/question/19089364

#SPJ11

syntax is: group of answer choices words that have a special meaning in the programming language rules that must be followed when writing a program punctuation symbols or words that perform operations

Answers

Answer:Syntax is rules and regulations for the symbols used in a programming language that must be used in proper structure to be executed.

Explanation:Every computer programming language has a pre defined structure of that particular language for execution. Use of proper sign and symbols in a properly pre defined order is must for the computer system to be undestood.

Example: Like any langage i.e. hindi or english there is a grammar of that langage that defines the proper structure of the language, the same way computer languages uses their own syntax and semantics to underdtand the language.

Following the rules is crucial to ensure that the program runs smoothly and without errors.

Syntax refers to what?

Syntax refers to the programming language rules that must be followed when writing a program. It includes punctuation symbols or words that perform operations and have a special meaning in the programming language. Following these rules is crucial to ensure that the program runs smoothly and without errors.

Learn more about Syntax

brainly.com/question/31122705

#SPJ11

consider a packet of 4000 bytes (including 20 bytes ip header and 3980 data bytes) that must pass a link with maximum transfer unit (mtu) being 1500 bytes. let x be the 16-bit identifier of the packet. how many fragments will this packet be divided into? give the values of the following fields in the ip header of each fragment packet: length, identifier, fragflag, and offset. (hint: check the pages of ip fragmentation in chap4-5.pptx)

Answers

This process of fragmentation allows packets to be Transmitted across a network despite the limitations of the maximum transfer unit.

When a packet of 4000 bytes with an IP header of 20 bytes and 3980 bytes of data is transmitted through a link with a maximum transfer unit (MTU) of 1500 bytes, it will need to be fragmented into multiple packets. The maximum size of each fragment will be 1480 bytes (1500 - 20 bytes of IP header).

To determine the number of fragments, we first need to calculate the total number of bytes that need to be transmitted (including the IP header). This would be 4020 bytes (4000 + 20 bytes of IP header). Next, we divide this number by the MTU size of 1500 bytes to get the number of fragments required. This comes out to be 3 fragments.

The first fragment will have the length field set to 1500, the identifier field will be set to x, the flag field will be set to 1 (indicating that this is the first fragment), and the offset field will be set to 0.

The second fragment will have the length field set to 1500, the identifier field will be set to x, the flag field will be set to 1 (indicating that this is the second fragment), and the offset field will be set to 1480 (since the first fragment has already taken up the first 1480 bytes of the original packet).

The third fragment will have the length field set to 1040, the identifier field will be set to x, the flag field will be set to 0 (indicating that this is the last fragment), and the offset field will be set to 2960 (since the first two fragments have already taken up the first 2960 bytes of the original packet).

Overall, this process of fragmentation allows packets to be transmitted across a network despite the limitations of the maximum transfer unit. Each fragment is still able to carry all the necessary information and can be reassembled at the destination to form the original packet.

To Learn More About Transmitted

https://brainly.com/question/30244668

SPJ11

a computer technician wants to purchase a cable modem capable of combining multiple channels to increase traffic flow from two 20 mhz channels to a single 40 mhz channel. what is the combination of channels called in this instance?

Answers

The combination of channels that a computer technician wants to purchase a cable modem capable of combining multiple channels to increase traffic flow from two 20 MHz channels to a single 40 MHz channel is called channel bonding.

Channel bonding refers to combining two or more independent channels to create a larger data pipe for increased data rates. When cable modems use this method, it's known as "channel bonding." Channel bonding is used to increase the efficiency of data transfer, particularly in high-bandwidth applications, by combining several channels into a single link.The following are the advantages of channel bonding:Increased bandwidth: Since two or more channels are combined into a single data path, channel bonding effectively doubles or triples the bandwidth rate. As a result, you may receive data more quickly and smoothly on your device.Smoother data transfer: Channel bonding also improves the data transfer experience because data flows more smoothly through the merged channels.Improved reliability: Channel bonding enhances signal quality and consistency, which can help to prevent buffering, lagging, and dropped connections during use.

Learn more about channels here:

https://brainly.com/question/30369845

#SPJ11

a customer calls, when they power up the computer, they get a blank display after a series of audible beeps sound. which one of these actions would be valid for this situation? select the correct response.

Answers

A valid action that could be taken in this situation is to check the RAM or memory module.

RAM or random access memory is a type of computer memory that can be randomly accessed. It is a volatile memory, which means that the data stored in it is lost when the computer is turned off. The computer stores data temporarily in RAM so that it can be accessed quickly when needed. If a computer is not working properly or is making beeping sounds, it may indicate that there is a problem with the RAM or memory module.So, one of the actions that can be taken in this situation is to check the RAM or memory module.

If the RAM is not working properly or is not seated properly, it can cause the computer to produce a series of audible beeps and fail to display anything on the screen.

Learn more about RAM: https://brainly.com/question/13748829

#SPJ11

you are designing an update to your client's wireless network. the existing wireless network uses 802.11b equipment, which your client complains runs too slowly. she wants to upgrade the network to run up to 600 mbps. due to budget constraints, your client wants to upgrade only the wireless access points in the network this year. next year, she will upgrade the wireless network boards in her users' workstations. she has also indicated that the system must continue to function during the transition period. which 802.11 standard will work best in this situation? answer 802.11n 802.11b 802.11a 802.11d 802.11c

Answers

The best 802.11 standard to upgrade your client's wireless network in this situation would be 802.11n. This standard can provide speeds of up to 600 Mbps, meeting your client's requirement for faster performance.

Additionally, 802.11n is backward compatible with 802.11b, which means that during the transition period, the network will continue to function with the existing 802.11b equipment until the wireless network boards in the workstations are upgraded next year. Other standards such as 802.11a, 802.11d, or 802.11c may not offer the same level of compatibility or performance, making 802.11n the ideal choice for this scenario.

For more such question on network

https://brainly.com/question/28342757

#SPJ11

You get to play journalist today. The topic of your story is one of the laws discussed in this lesson. You will select one of them to research. While researching, you will learn more about the law and will locate a case that went to court. Then you will write an unbiased article or broadcast describing the law and summarize the case and the stand of the parties involved. Be sure to review and abide by The Cannons of Journalism. Be sure to include:

a description of the law;
how the law relates to digital media;
one example of a case that went to court;
a discussion of the case and the parties involved; and
a summary of the outcome of the case.
Some helpful hints in finding a case are:

Search for “case law,” “court case examples,” and “case studies.”
Include the full name of the law and the acronym.
Discuss the impact these laws have on one or more media outlets in your community.
You will write your report as an article with at least 500 words that will be posted on an online news site or that a broadcast journalist will report on TV news.

Answers

The Digital Millenium Copyright Act (DMCA), which was passed into law in 1998, is one significant piece of legislation pertaining to digital media. A legal basis for copyrighted content protection is provided by the DMCA.

What research methods do journalists use?

Journalistic research has many different components, including online searching, poring over data, records, surveys, and polls; phone calls with sources, experts, and officials; formal in-person interviews; trips to libraries and archives; and the traditional method of pounding the pavement and networking.

How do reporters find their stories?

Journalists use a variety of sources to gather articles and news items for their work. The inspiration sometimes comes from close friends, but most of the time it comes from freely available public sources.

To know more about Copyright  visit:-

https://brainly.com/question/22399852

#SPJ1

michelle recently launched a new product called wonder boots. she wants to attract more traffic via ads but only for searches that are solely for her product name, wonder boots. how can michelle attract search traffic for wonder boots product name queries only?

Answers

Michelle can use pay-per-click (PPC) ads through search engine advertising platforms like Go o g le Ads or B i ng Ads.

How can she do this?

She can create a campaign specifically for the Wonder Boots product name, targeting only exact match keywords that include "Wonder Boots". This way, the ad will only appear when someone searches for "Wonder Boots" or a close variation of the exact term.

Michelle can also add negative keywords to the campaign to prevent her ad from appearing for unrelated searches. By doing this, she can ensure that her ad is shown only to people who are actively searching for her product.

Read more about search query here:

https://brainly.com/question/13222424

#SPJ1

an operating system uses available storage space on a startup drive for . select all that apply. a. storing programs b. virtual memory

Answers

An operating system uses available storage space on a startup drive for storing programs and virtual memory. Therefore, the correct options are a and b.

What is an operating system?An operating system is software that manages computer hardware and provides basic services for computer programs. An operating system (OS) serves as a link between applications and the hardware of a computer. Without an operating system, a computer is unable to operate. It is also responsible for memory management, security, and file and disk management.What is virtual memory?A computer can use virtual memory to simulate additional memory. The operating system allocates a part of the storage space on the hard drive to be utilized as an additional RAM memory. When the actual memory runs low, the operating system swaps the data from RAM to virtual memory, thus freeing up space. This technique is known as virtual memory, and it assists the computer in running larger applications or running many applications at once.

Learn more about operating system here:

https://brainly.com/question/31141315

#SPJ11

Final answer:

The southbound API that matches the description of being a Cisco proprietary API is OnePK.

Explanation:

In Cisco networking, there are several southbound APIs available. One of them is the Cisco proprietary API, which is specifically developed by Cisco for their networking devices. This API enables network administrators to interact with Cisco devices and control their behavior programmatically.

The Cisco proprietary API, also known as OnePK (One Platform Kit), provides a standardized interface for communication between the network controller and the network devices. It allows developers to access and manipulate various network functionalities, such as configuring network devices, retrieving network statistics, and managing network resources.

With the Cisco proprietary API, network administrators can automate network management tasks, streamline network operations, and integrate Cisco devices into their network infrastructure more efficiently.

Learn more about cisco networking here:

https://brainly.com/question/32538867

#SPJ14

A program is written to categorize images. One of its functions is to find a image of a bird. There are four images in the data set that are of the same size. The computer processing this information has four cores that can be used to perform this operation. How much faster can the data set be processed if the computer uses all its performing power?

A) There is no change to the processing speed
B) The processing time will decrease by 25%
C) The processing time will decrease by 50%
D) The processing time will decrease by 75%

Answers

Assuming the program is parallelizable and can distribute the work among the four cores evenly, the processing time will be reduced by a factor of 4. Therefore, the correct answer is option D) The processing time will decrease by 75%.

How much faster can the data set be processed if the computer uses all its performing power?

If the program can be parallelized and distributed equally among the four cores, then the processing time can be reduced by a factor of 4. This is because each core can work on a separate image simultaneously. Therefore, the correct answer is option D) The processing time will decrease by 75%.

Learn more about processing in:https://brainly.com/question/29487063

#SPJ1

which type of password attack is used on weak passwords and compares a hashed value of the passwords to the system password file to find a match?

Answers

The type of password attack that is used on weak passwords and compares a hashed value of the passwords to the system password file to find a match is known as a dictionary attack.

A dictionary attack is a type of password attack in which an attacker uses a precompiled list of words, often drawn from a dictionary, and compares each word's hashed value to the password hash in the system password file to find a match. This type of attack is effective on weak passwords that can be easily guessed by an attacker.

It is important to use strong passwords that are difficult to guess in order to prevent successful dictionary attacks. Additionally, system administrators can implement measures such as salting and hashing to make it more difficult for attackers to obtain a user's password.

You can learn more about password attacks at: brainly.com/question/30739304

#SPJ11

what are the advantages and disadvantages of prototyping? describe the steps in prototyping. give at least two circumstances under which prototyping might be useful.

Answers

Prototyping is a useful tool to help spot potential flaws and identify areas for improvement, reducing the likelihood of design errors. Prototyping helps in a more detailed and better analysis of data, facilitating better decision-making. Prototyping is used as an effective communication tool between the team and clients.

Advantages of Prototyping: Here are the advantages of prototyping: Prototyping enables a preview of the product or process. It allows businesses to have an idea of how their product or service will look before they invest in it completely.

Disadvantages of Prototyping: Here are the disadvantages of prototyping: The process of prototyping can be expensive in both time and money. It can also delay the final product from being completed. Poor communication between the development team and the client can cause errors to go unnoticed, rendering the prototype irrelevant. There is a chance that prototyping may not be useful when building larger systems. This is due to the complexity of the system and the number of components involved.

Testing: Once the prototype has been built, it is tested by the team and/or the users to identify any flaws or bugs. Feedback is then provided for improvement. Improving: Based on the feedback, the team can identify areas for improvement and work on them until they come up with the final product.

Circumstances under which prototyping might be useful: Prototyping is useful under these circumstances: Prototyping is useful when creating a new product or process. It allows the team to get a clear idea of what they are building and how it will look. Prototyping is useful when designing user interfaces. It enables designers to create a working interface, allowing users to provide feedback and identify areas for improvement.
The advantages of prototyping include the ability to identify design flaws early, gather user feedback, and improve communication among team members. Disadvantages of prototyping include the potential for wasted resources, insufficient analysis, and misleading results.

The steps in prototyping are:
1. Define objectives: Determine the purpose and goals of the prototype.
2. Create a design: Sketch or model the prototype based on the objectives.
3. Build the prototype: Construct the prototype using appropriate materials and tools.
4. Evaluate and refine: Test the prototype, gather feedback, and make improvements as necessary.
5. Finalize the design: Complete the design based on the evaluation results and prepare for implementation.

Two circumstances under which prototyping might be useful are:
1. When developing a new product or system, it helps identify potential issues and gather user feedback before committing to full-scale production.
2. When making changes to an existing product or system, it allows testing of new features or modifications without disrupting the current implementation.

Learn more about Prototype:

https://brainly.com/question/28187820

#SPJ11

PLease help I dont understand lol.

Answers

Answer: I believe the answer would be A. List

Explanation: An array is a way to represent multiplication and division using rows and columns. Rows represent the number of groups. Columns represent the number in each group or the size of each group.

a data analyst needs to migrate data from a server located at their company's headquarters to a remote site. this can lead to what type of data integrity issue?

Answers

If an analyst does not have the data necessary to accomplish a business goal, they should request additional time and collect relevant data on a smaller scale.

How does data cleaning work?

Correcting or removing incomplete, duplicate, corrupted, improperly formatted, corrupted, or incomplete data from a dataset is known as data cleaning. There are numerous opportunities for data to be duplicated or mislabeled when multiple data sources are combined. Even though they might appear correct, results and calculations are questionable if the information is incorrect. There is no one-size-fits-all method for prescribing the precise steps in the data cleaning process because the processes will differ from dataset to dataset. However, in order to maintain consistency, you must develop a template for your data cleaning procedure.

To learn more about data visit :

https://brainly.com/question/29822036

#SPJ1

What does the Find Duplicates Query Wizard help identify?

records that contain the same data as other records
records that contain errors in their data or formatting
records that are used in relationships with other tables
records that are matched up with too many other tables

Answers

The Find Duplicates Query Wizard helps identify records that contain the same data as other records in a database. This tool can be used to search for duplicate entries in one or more tables, and can be useful for identifying data inconsistencies and errors. Therefore, the correct answer is:

records that contain the same data as other records.

which of the following usually provides dhcp services to dynamically assign ip addressing information to wireless clients and connect the wireless network to the internal wired network and the internet? answer controllers backhauls bridges access points

Answers

To dynamically assign IP addressing information to wireless clients and connects the wireless network to the internal wired network and the internet use device: an access point.

Access points are responsible for both linking the internal wired network to the wireless network and connecting the wireless network to the internet.DHCP stands for Dynamic Host Configuration Protocol. It is a protocol used to dynamically assign IP addresses to devices connected to a network. The DHCP server assigns IP addresses to devices on the network and ensures that no two devices share the same IP address. This protocol saves network administrators the trouble of manually assigning IP addresses to every device connected to the network.

Learn more about access point: https://brainly.com/question/9310987

#SPJ11

in 2015, the nation of burundi had an average bandwidth per internet connection of 11.24 kb/s. in 2016, their average bandwidth was 6.91 kb/s.which statement is true based on those statistics?

Answers

Using the provided statistics, the statement that is true is that the average bandwidth per internet connection in Burundi decreased from 11.24 kb/s in 2015 to 6.91 kb/s in 2016. This means that the average speed at which data is transmitted over the internet in Burundi decreased over the course of a year.

The decrease in average bandwidth per internet connection could be attributed to a number of factors, including a decrease in internet infrastructure investment or the increase in the number of internet users without a corresponding increase in infrastructure. This decrease in bandwidth could have significant impacts on internet users in Burundi, including slower internet speeds, longer download times, and difficulty streaming videos or other multimedia.

For such more question on bandwidth

https://brainly.com/question/12908568

#SPJ11

Marney is a pilot. She typically flies passengers from New York to Los Angeles everyday. She is always talking with dispatchers located in the control tower to make sure no other pilots are taking off when she does. Marney’s tasks are typical of someone working in

it's not A or B?


A. Facility Equipment Maintenance. ←


B. Logistics Planning and Management Services. ←


C. Transportation Operations.


D. Health, Safety, and Environmental Management.

Answers

i think c. Because she isnt a maintenance worker, doesnt do math in logistics, she does do transportation services, shes capable of health and safety but her main job is to fly passengers.

what specific versions of certificate templates are supported by windows server 2016? (choose all that apply.)

Answers

Based on the information available, Windows Server 2016 supports the following versions of certificate templates: Version 4 templates and Version 3 templates. So, options B and C are correct.

Windows Server 2016 does not support Version 2 or Version 5 templates. Version 2 templates were introduced in Windows Server 2003 and have been deprecated since Windows Server 2012, while Version 5 templates were introduced in Windows Server 2016 and are not supported in Windows Server 2016. Therefore, only Version 4 and Version 3 templates are supported in Windows Server 2016.

Some of the notable features of Windows Server 2016 include:

Nano Server: A lightweight, headless installation option of Windows Server designed for cloud-based and containerized deployments.Docker integration: Windows Server 2016 has built-in support for Docker containers, allowing for easy deployment and management of containerized applications.Hyper-V enhancements: Windows Server 2016 includes updates to the Hyper-V virtualization platform, such as support for Shielded Virtual Machines, Rolling Cluster Upgrades, and Production Checkpoints.Improved security: Windows Server 2016 includes enhanced security features such as Windows Defender, Credential Guard, Device Guard, and Just Enough Administration (JEA) to help protect against modern security threats.

Overall, Windows Server 2016 is a powerful and feature-rich server operating system that provides improved security, performance, and scalability for enterprise-level environments.

Learn more about Windows Server 2016

brainly.com/question/31082129

#SPJ11

The complete question is:

What specific versions of certificate templates are supported by Windows Server 2016? (Choose all that apply.)

A) Version 5 templates

B) Version 4 templates

C) Version 3 templates

D) Version 2 templates

Other Questions
ASAP PLEASE GOTTA DO MY LAST UNIT OF ENGLISH ALL TODAYDirections:Respond to the following prompt by writing an essay of at least 750 words.According to Camus in The Myth of Sisyphus, fate...is a human matter which must be settled among men....At the subtle moment when man glances backward over his life...he contemplates that series of unrelated actions which becomes his fate, created by him, combined under his memory's eye and soon sealed by his death ...he concludes that all is well. Apply this philosophy to the character of Meursault.In your essay, sure to:cite at least three examples from the novel or essay to support your thesiscite at least two additional outside sources to support your thesisutilize MLA format to reference and cite your sources 1: "How did Great Buy handle the return?" asks Sam."They promptly sent us two replacement monitors on October 10, as soonas we returned the damaged ones," Monique replies. "And on October 28,they sent us an invoice for the entire order. We paid them with a check thatsame day."Monique shows Sam the invoice from Great Buy, which reflects the tworeplacement monitors that Berthold's received after returning the damagedones and asks him to process it for payment.DESCRIPTIONComputer monitors (original order, $350 x 8)Computer monitors (replacements, $350 x 2)TOTAL:AMOUNT8 of 12$2,800$700$3,500What information would be recorded in the Accounts Payable ledger, whichhad a previous balance of $2,800? Express the function graphed on the axes below as a piecewise function. 3. Which statement best explains the metaphor quotedfrom paragraph 1?"Thomas Baker stepped on your foot with his dirtyboots and turned your sneaker into a constructionsite."OA. The boy's shoe is very dirty because ThomasBaker stepped on it.OB. Thomas Baker is a bully who steps on people'sshoes for no reason.OC. The boy's shoes are dirty from playing around atthe construction site.O D. Thomas Baker works at a construction site so hisboots are always dirty. one of the buyer representation forms published by c.a.r. is the brnn. what do the two ns stand for? help mee with this question macroeconomics is the study of small economic units such as households and individual businesses. group of answer choices true false what does the contrast in infant mortality between whites and african americans indicate, when compared with the contrast in infant mortality between the poorest 20 percent and the richest 20 percent? group of answer choices currently existing racial inequalities cannot be wholly explained through reference to class disparities. economic inequalities lead to larger health disparities than racial differences do. class disparities between whites and blacks account for approximately four-fifths of the inequality observed between the two groups. the infant mortality rates observed among the poor are almost entirely a result of the high numbers of ethnic and racial minorities living in poverty. what is the practice of acknowledging the activities and contributions of one racial group over others within a multicultural society? Following the Bandung Conference, the United States ______.a. deployed military forces to aid several Asian and African movements as a warning to burgeoning nationalist movementsb. increased international aid to persuade governments of less-developed countries to resist nationalization and ally with the United Statesc. announced an economic embargo on trade with any nations which had met at the conferenced. pledged its commitment to building liberal democracies in the American image after years of negotiating short-term contracts with its suppliers, icon images has decided to agree to longer-term contracts. in doing this, icon images is hoping to: when a new position in her collective bargaining unit opened up, anke thought she should get the position because she had similar experience at a previous job. however, the job went to someone who had more seniority, but less skill. anke thought this was unfair. what is the first thing anke should do to ensure the contract was enforced correctly? savanna built a rectangular pen got her goat that was 20 yards long and 15.4 yards wide. what is the area of this pen? Ally needs 90 meters of tape for a project. Tape comes in different size rolls. If she bought 50 meters, 22.86 meters, and an 18.288-meter roll, how much tape will she have in all? ___________ meters jill is rh negative. her first baby was rh negative. she is pregnant again, but the baby is rh positive. without medical treatment, will jill make antibodies that may attack the baby's blood? Sean has 14 friends n are in grade 7 and 9 are in grade 8 what is the equation How many bones are in human body describe how a one-term limit can be an advantage for a political system. describe how a one-term limit can be a disadvantage for a political system. the npv of a project can be thought of as the present value of its multiple choice economic rents. profits. salvage value. revenues. the period of a mass-spring oscillator is 2.76 s. every time the oscillator completes a full period, the amplitude of the oscillation gets reduced to 91.7 percent of the previous amplitude. how much time does it take for the amplitude to decay to 44.5 percent of its original initial value?